INSTALLATION & TREATMENT
 
Home » Solutions » Installation & Treatment
   
 

 

Advantages

 

Installation & Treatment

 

Lure Box

How to Install ?
 
1. Best source of information talk to the owner of the dwelling
   
2. Do timber pest inspection for inside and outside dwelling and surrounding gardens
   
3. Tape measurement outside house. To install Terminator Tube recommended distance is 3 meter apart.

Installation
Using an augur or petrol or hand auger make a depth of 16 inches or 400 mm.

installation

Place tube into hole and make sure it is firmly fitted into the ground. Remove bait from vacuumed seal bag, place bait into tube, then place polystyrene foam disc inside tube on top of bait. Place lid on top of tube, fit firmly using locking key to firmly tighten the lid. Continue this process every 3 meter.

installation   installation
Insertion of the Terminator Tube into the ground   Baits are inserted into the Terminator Tube
     
installation
Cross Sectional view of Terminator Tube
   
4. After installing Terminator Tube, do a map of Terminator Tube for example from no.1 statio n to 20 for office records to refer to

installation
   
5. Recommend to check Terminator tube within 1 month for infestation and 2 months after the 1st inspection. To treat infestation inside Terminator Tube use dusting padder or what is approved in your country for treating baiting system.

installation   installation
Tube inspected within one month for termite infestation   Terminator Tube in action

When sufficient termites are found in the tube, termicides are used to eradicate these termites, infecting the Queen and entire colony.

installation   installation
   
6. Return in 14 days, remove baits, wipe clean Terminator Tube with clean cloth and replace a new Terminator Tube with a fresh bait. Recommended check after 2 months.

installation
   
 
 
 
 
Copyright © 2009 KJ Terminator. All Rights Reserved.